Sustainable Energy

Statcoms, Thurles

Client:  ESB Networks
EPC Main Contractor :Suir Engineering / Siemens
Site Development :Killeen Civil Engineering
Description: Working for Suir Engineering to undertake the Site Development and Civil Works for A STATic synchronous COMpensator (STATCOM). This is a fast-acting device capable of providing or absorbing reactive current and thereby regulating the voltage at the point of connection to the ESB power grid.

Our Package for the Groundworks included, Site Clearance, Earthworks, Groundwater Control, Substructure to the Control Building, Concrete Plinths for the Electro Mechanical Equipment, Site Drainage, UPVC Ducting, Block Ducting, Access Roads (Permanent and Temporary), Earthing and Compound Construction.

Tullabeg 110kv AIS Substation

Client: ESB Networks
EPC Main Contractor: Suir Engineering / Siemens
Site Development: Killeen Civil Engineering
Description: The project involved the execution of civil works for the construction of a 110kV Air-Insulated Substation (AIS). The scope of civil activities included site grading, excavation, and the construction of foundations for transformers, circuit breakers, and other substation equipment. The contractor-built control room buildings, cable trenches, and duct banks for power and control cables. Structural works included steel structures for busbars and gantries. Additionally, proper drainage systems, fencing, and access roads for operational efficiency and safety. All works adhered to stringent quality and safety standards, ensuring the substation’s readiness for electrical installation and commissioning.

Maxol Ballycoolin Electric Vehicle Charging Points

Client: Maxol
Site Location:Newbridge & Ballycoolin
Site Development: Killeen Civil Engineering
Description: In this project, Killeen Civil Eng. was tasked with installing a network of electric vehicle (EV) charging stations the commercial complex’s in Newbridge and Ballycoolin. The scope of work included site preparation, trenching for electrical conduits, pouring concrete foundations for the chargers, and integrating the charging units with existing electrical infrastructure. The contractor ensured compliance with safety standards, proper drainage, and accessibility guidelines. Additionally, they coordinated with electrical engineers to ensure the chargers were fully operational. This project supports the growing demand for EV infrastructure and promotes sustainable transportation solutions.